before repair

This is the area  where the leach field needs to be repaired.

gravel pile

First step is the delivery of the gravel.

Dick Karhoff in tractor

Dick Karhoff is ready to begin digging.

gravel piles

More piles emerge.

trench

Rich Lottinville, Rick Coy,  Don Fouriner and Curt Crawford assist in digging the trench.

finishing repair

The repair is nearing completion.

drain field repaired

The leach field has been repiared.

leach field repaired

Ready for grass.